fbpx
Connect with us

Social Stories

7 Fun Facts About the Exchange 106 That’s Set to Open in September 2018

Published

7 Amazing Facts That You Should Know About The New Tallest Building In M'Sia - World Of Buzz
Source: Instagram

Follow us on Facebook, Youtube, Twitter, and Instagram for the latest stories and updates daily.

For many years, the Petronas Twin Towers have reigned over the skyline of Kuala Lumpur as the tallest building in Malaysia and Southeast Asia. However, a new and upcoming skyscraper is set to dethrone the Twin Towers upon its completion.

Yes, we’re referring to the famous Exchange 106 that is currently being constructed in Tun Razak Exchange area. The building is so phenomenal that it was even described as “the construction game-changer“, so we’ve compiled a few interesting facts that you should know about this upcoming new building!

Fascinating Facts About The Exchange 106 - World Of Buzz

Source: instagram

 

1. It will be the new tallest building in Malaysia and Southeast Asia

As the name suggests, the Exchange 106 has a jaw-dropping 106 floors as compared to 88 floors in the Twin Towers. Here’s how much the two iconic landmarks differ in height.

Petronas Twin Towers: 451.9m
Exchange 106: 492.3m

This building is so tall that it’s now among the top 15 tallest buildings in the world!

25507983 1948036628851269 5325503217940919661 N

Source: facebook

 

2. The building’s car park bays can fit over 2,000 cars

If this impressive building is going to house your office later in the year, parking space is one thing you don’t have to worry about, because there are 2,116 car park bays available for tenants! 

Screen Shot 2018 01 30 At 1.21.43 Pm

Source: instagram

 

3. The construction involves one of the largest concrete pours in the world

Just to paint a better picture, 13,200 cubic metres of concrete was poured in during the construction of the Twin Towers. It was done in the span of 53 hours for each tower, thus making it the largest and longest concrete pour in Malaysian history. 

However, as for the Exchange 106, 20,200 cubic metres of concrete was poured into an area, which is as big as eight Olympic swimming pools combined!

The process was carried out over the span of 48 hours, making it the second largest concrete pour recorded GLOBALLY!

Screen Shot 2018 01 30 At 1.26.22 Pm

Source: youtube

Screen Shot 2018 01 30 At 1.34.17 Pm

Source: youtube

The whole operation was so huge that it required:

  • 120 cement mixers
  • 8.5 million kg of cement
  • 16 million kg of sand
  • 19 million kg of construction aggregates
  • 2 million kg of ice to counter the heat generated in the construction process
Screen Shot 2018 01 30 At 1.27.45 Pm

Source: youtube

 

4. One full floor is completed every two to three days

According to project director Roland Suckling, the building was specifically designed so that it can be erected speedily and more efficiently. Coupled with their strategies, the construction’s rate of progress is certainly impressive!

“We started off with a four-day cycle. A full floor is completed every four days. Then we moved to a three-day cycle. At the top of the building now, we’re doing two-day cycles on the concrete floor slabs,” Roland said. 

Also, this progress is made possible thanks to some 2,000 workers of different nationalities who work 22-hour shifts every day of the week.

Screen Shot 2018 01 30 At 1.39.50 Pm

Source: instagram

Screen Shot 2018 01 30 At 1.37.10 Pm

Source: instagram

Screen Shot 2018 01 30 At 1.40.42 Pm

Source: instagram

 

5. The construction and interior decorations are actually taking place simultaneously

“Normally the contractors come in and build the structure, and then the internal decoration team will come. However, they are doing this simultaneously, which helps reduce the duration of the project,” China to Malaysia Ambassador, Bai Tian said.

Screen Shot 2018 01 30 At 1.44.09 Pm

Source: sinchew

Thanks to this, the building should be ready for its grand opening by the third quarter of 2018.

 

6. This building is being made using cutting edge green technology

To construct this skyscraper, here are some of the cool features being used that are energy-efficient and environmentally-friendly;

  • High performance insulated glass
Screen Shot 2018 01 30 At 1.45.14 Pm

Source: instagram

  • Energy-efficient mechanical, electrical, plumbing (MEP) systems with Star rating
  • 100% LED lighting
  • State-of-the-art lift technologies
Screen Shot 2018 01 30 At 1.47.35 Pm

Lift at the basement carpark | source: instagram

In fact, the Exchange 106 is certified as a Green Building by Green Building Index (GBI)!

 

7. It’s going to look super luxurious

Although the Exchange 106 is often described as a modern international financial hub, the interior design makes it appear very luxurious! These are the few features that you can expect to see in the building upon completion:

  • High ceilings finished in English Burl wood
  • A 15 metre-tall entrance lobby
  • A concierge reception comparable to five-star hotels in the region
  • Exquisite sky lobby offering breathtaking views of the city
  • Marble floors and walls of the highest quality in the lobbies
Screen Shot 2018 01 30 At 1.48.50 Pm

Lift at the lobby | source: instagram

In short, the building is super ‘atas’! 

 

Based on what we’ve heard so far, this architectural gem in the heart of KL certainly looks promising!

The Exchange 106 is expected to complete in September 2018 and judging from the speed of the construction, we don’t see why they can’t keep up with the schedule!

 

Also read: The Rawang Bypass Will Officially Open on 29 November, Here Are 7 Cool Facts About It

Highway Featured

Follow us on Facebook, Youtube, Twitter, and Instagram for the latest stories and updates daily.



Just In

Collage 12 Collage 12
News14 hours ago

“It’s against principles of Islamic justice” – Perak Mufti Tells M’sians to Stop Boycotting KK Mart

KK Mart is still facing the wrath of boycott movements following the Allah socks issue. Is it time we put...

My Post 1 2024 05 03T164055.030 My Post 1 2024 05 03T164055.030
News15 hours ago

M’sians are Questioning How Microsoft’s RM10.5Bil Investment Will Bring 300k Job Opportunities

It was recently announced that Microsoft will invest RM10.5 billion to build cloud and AI infrastructures in Malaysia over the...

My Post 2 50 My Post 2 50
News15 hours ago

Perak Market Fish Vendor Admits to Peeing at His Stall in Front of Customers, Says He’s Short Staffed

While wet markets have always been, well, wet and a little dirty, no one would expect there to be human...

Feat Image Media Feat Image Media
News16 hours ago

M’sia Falls 34 Spots in World Press Freedom Index 2024 Due to Alleged Govt ‘Censorship’ of Criticism

Malaysia is no longer the highest-ranked Southeast Asian nation in the World Press Freedom Index 2024, the latest edition of...

Feat Image Hotline Jakim Feat Image Hotline Jakim
News19 hours ago

JAKIM Sets Up 24-Hour Special Hotline for M’sians to Channel Complaints About Insults to Islam

The Department of Islamic Development Malaysia (JAKIM) has launched a special 24-hour hotline for the public to channel complaints regarding...

Collage 21 Collage 21
News2 days ago

High Court Upholds Siti Bainun’s 12 Year Jail Term for Neglecting & Abusing Bella, Teen With Down Syndrome

3 years ago, the notorious Bella case shocked the entire nation of Malaysia, and last year, founder of Rumah Bonda,...

Collage 8 Collage 8
News2 days ago

“They’re like chicken” – M’sian Prof Suggests Cooking & Eating Pigeons to Solve Their Overpopulation

Pigeons are harmless but not when they fill the ground with their excretes, which may contain bacteria and viruses that...

My Post 1 2024 05 02T140315.176 My Post 1 2024 05 02T140315.176
News2 days ago

“Yeah, I think so” – KJ Shares Interest in Becoming the Leader of Malaysia Some Day

Following his retirement from politics after holding roles such as Minister of Youth and Sports, and Minister of Health, it’s...

Announcement

Latest Videos



TRENDING TODAY