The Desa Tun Razak, Kuala Lumpur flyover has collapsed once again in the midst of construction at around 6pm today (3 March 2021). Netizens sharing information said that the collapse happened when a crane was passing through the flyover and got stuck, thus causing the collapse.
Netizens said that the accident caused several cars to immediately press their brakes in unison. The situation on site appears to be serious but the number of casualties is still unknown.
The accident reportedly happened on the SUKE (Sungai Besi-Ulu Kelang Elevated Expressway) towards the direction of TBS. A report from Utusan revealed that flyover collapsed at the MRR2 construction site.
Stay tuned for more updates!
Also read: Reckless Driver Jumps To Death at Penchala Link Flyover After Hit-And-Run On Jalan Tun Razak